Giving and Receiving Feedback Questions
Exchanging feedback constructively in both directions. Covers delivering specific, actionable, and respectful critique to peers, juniors, senior colleagues, cross-functional partners and direct reports, including written review comments on code, documents and analyses that separate must-fix from minor points; receiving feedback and criticism without defensiveness, asking for clarification, pushing back with reasons, and closing the loop afterwards; choosing the channel and setting (live or written, public or private) and adapting to cultural norms; handling defensive reactions; and building feedback loops and habits on a team. Assesses the ability to help others improve without damaging the relationship. Excludes the candidate's own coachability and growth after being given feedback, stories of the candidate's own mistakes, sustained mentoring and development plans, resolving disputes between parties, design-critique craft, and code-review policy and process standards.
A respected senior engineer consistently resists design changes proposed in review, and you need to give them feedback about it. How would you approach the conversation, keep it about impact rather than personality, and follow up?
Sample Answer
Direct answer
I'd first decide whether this is a pattern or just legitimate technical disagreement, then have a private conversation grounded in specific review threads and their impact, ask what is driving the resistance, agree on how disagreements will be settled, and follow up after a defined period. I'd keep "this is how decisions are being made" separate from "you are difficult."
Step 1: Check yourself and gather evidence
- Is the senior engineer sometimes right? Resistance can be valuable. I'd look at the last four or so reviews: did they push back with reasons, or block with no engagement?
- Write down 2 to 3 concrete threads: what was proposed, what they said, what happened (a change stalled for a week, the author gave up).
Step 2: Private conversation, impact-focused
"I want to talk about design review. In the retry-logic pull request (PR, a proposed code change sent for review), three comments asked for the same approach without a reason, and the author stopped replying. The change sat a week. I value your judgement on this system. How do you see those reviews?"
Listen. They may hold context you lack (an earlier outage), or feel their standards are being eroded. If so, ask them to write that context down, which helps everyone.
Step 3: Agree a working rule
For example: "If we disagree, the author and reviewer each write the trade-off in two lines and we pick by the criteria in the design doc (the written proposal for the system, which lists goals and constraints)." That moves the argument from personality to criteria.
If the dispute is technical, and if the resistance happens in a public thread
- ML modeling approach: if they resist a different model type, propose a small offline comparison (testing both models on saved historical data, with no live users involved) using the same data and the same metric, with the decision rule agreed beforehand. For example: "We run both on last quarter's data and measure recall at 90% precision. If the new model improves recall by at least 2 points, we adopt it; otherwise we keep the current one." Evidence replaces authority.
- Public forums: if resistance happens in a meeting thread, reply briefly on substance there ("good point, let's compare options") and move the personal part offline. Do not critique them in front of others; it damages morale and makes them dig in harder.
Step 4: Follow up
Two weeks later, re-read the new review threads and say what improved. For example: "Of the five design reviews since we talked, four had a written reason for each requested change and none sat longer than two days, down from a week. Thanks, that unblocked the team." If it persists, involve their manager after telling them.
Pitfalls
Do not frame it as "your attitude," do not skip listening, and do not assume rank equals being right or wrong.
During a review you spot a change by a respected senior engineer that will likely perform badly at scale. How do you word the comment and handle the follow-up so the risk is surfaced and the relationship stays intact?
Sample Answer
Direct answer
I write the comment around evidence and a question, in the pull request (PR) so there is a record, not around the person's seniority: describe the specific code path, the scale where it breaks, and ask about their assumptions. I mark it as a real concern, offer a way to test it, and if we still disagree I take it to a design conversation with the right owner. Respect shows in the evidence and the tone, not in staying silent.
How to word it
- Name the behavior and the scale. "This loop issues one query per order row (the N+1 problem: one query to list N rows, then N more to fetch details). With 2,000 rows that is 2,001 queries per request."
- Ask about assumptions, don't accuse. "What volume do we expect for this endpoint? If it stays small, this is fine."
- Offer a test. "I can try it against the staging dataset (a test copy of realistic data) and share numbers." Measured results settle debates better than seniority.
- Suggest a direction. "A single joined query (one query that combines the orders and customers tables), or batching the lookups (fetching many customers in one request instead of one at a time), would avoid it."
- Label it, with a reason for the line. "Blocking if volumes are expected above ~100 rows; otherwise Consider." The ~100 is a team judgement, not a law. Illustrative arithmetic: if each query costs about 3 ms of round trip, 101 queries add roughly 0.3 s to a request, while 2,001 queries add roughly 6 s. Pick the line from your own latency budget and measured query time, and say so in the comment.
Follow-up
- If a reply is slow, a quick message: "Happy to pair on this if useful."
- If they disagree with evidence on their side, I update my view and say so.
- If we disagree and cannot resolve it: bring both views to the code owner (the person responsible for that part of the code) or the tech lead as a neutral question ("which risk is acceptable?") and write down the decision. Another compromise: merge behind a feature flag (a switch that turns the new code on or off without a new release) with a latency alert (a metric that warns if requests slow down), plus a follow-up ticket.
- Afterwards, keep the relationship warm: acknowledge when they were right about something else.
Worked example
Comment: "Possible performance issue at scale: get_orders calls fetch_customer inside the loop, so 2,000 rows means 2,001 queries (1 for the list plus 2,000 lookups). Is the expected volume small? If not, could we fetch customers in one query with a join? I can run this on the staging data and post the timing. I would treat it as blocking above roughly 100 rows and as a suggestion below that; the 100 is a team judgement, so tell me if the real volume sits on the other side."
Result: they point out the endpoint is limited to 50 rows by pagination (the API returns results in pages of at most 50). That is below the ~100-row line I set, so it is no longer blocking: 50 rows means 51 queries, not 2,001. I say, "Great, that changes it. Could we add a comment noting the limit?" and approve.
Trade-offs and pitfalls
- Deferring to rank lets known risks ship; ignoring rank creates friction. The evidence-first approach handles both.
- Do not make it public theatre: the PR is visible, so keep the tone neutral.
- Being wrong is possible. Ask first; they may know a constraint.
How do you decide between giving technical feedback live (a design review or call) and asynchronously (PR comments, docs, chat), and how do you make sure the feedback is acted on?
Sample Answer
Direct answer
My default is asynchronous (written, on the pull request (PR), doc, or ticket) for specific, checkable feedback, because it is precise, linkable and gives the author time to think. I switch to live when the feedback is about direction or architecture, when the topic is ambiguous or emotionally loaded, or when an async thread has gone about two rounds of reply and counter-reply without converging. I make feedback get acted on by turning it into items with an owner and a date, writing the outcome of any live conversation back to the written record, and checking at a set point.
Choosing the channel
| Signal | Live (call, design review) | Async (PR comment, doc, chat) |
|---|---|---|
| Feedback type | Direction, trade-offs, "should we build this at all" | Line-level, correctness, naming, test gaps |
| Ambiguity | High: needs questions back and forth | Low: the issue can be stated fully |
| Emotional load | High or likely to be misread in text | Low |
| Audience | Several people must align | One owner acts |
| Time zones | Overlap exists | Distributed |
| Record needed | Write the decision up after | The record is already there |
Making sure it is acted on
- Each item gets an owner, a due date, and a place (ticket or PR checklist), and I ask for a one-line reply.
- After a live review, I post the decisions and action items the same day; otherwise the conversation did not happen as far as absent teammates are concerned.
- At the next checkpoint I look at the list, not at my memory.
Reviewing SQL, ETL and dashboards
(ETL means extract, transform, load: the jobs that move and reshape data.) I use criteria, not taste, and put them in the review checklist:
- SQL: the output grain (what one row represents, for example one row per order), join correctness, row counts reconciled to the source, and readable formatting, enforced by a linter (a tool that automatically flags style problems) such as SQLFluff.
- ETL: safe to re-run without duplicating rows, automated data tests (for example the dbt tool's not_null check, which fails if a column has blanks, and unique check, which fails if a key repeats), and clear failure alerts.
- Dashboards: metric definitions written down, filters that behave as labelled, and the audience's question answered on the first screen.
A written review comment on a join might read: "This join to customers can return two rows per order when a customer has two addresses, so revenue is double counted. Row count before the join is 10,000 and after is 10,400. Please join on the primary address only, or aggregate first. Blocking, because the totals are wrong."
Tracking implementation uses the same method: checklist items in the PR or ticket, closed explicitly.
Example: a design review that changed a design, and the pushback
In a design review I flagged that a new feature chained three services synchronously (each call waits for the previous one to finish, so one slow or failed service stalls the whole request). If each service is up 99.9% of the time ("99.9% available"), the request only succeeds when all three are up, so the chain is about 99.7%:
0.999 x 0.999 x 0.999 = 0.997
That is roughly 26 hours of failure a year instead of 9, so one risky hop becomes everyone's outage. The owner pushed back: a queue (a buffer that lets work wait and be processed later, so the caller does not block) would cost two weeks. I asked what the real deadline was, separated must-fix from suggestions, and proposed a smaller step: make only one hop asynchronous, the one with the worst incident history (the weakest link in practice, even though the 99.9% figure above is a simplifying assumption of equal services), meaning it runs through the queue instead of making the caller wait. That leaves two synchronous services: 0.999 x 0.999 = 0.998, about 17.5 hours of failure a year instead of about 26. We agreed, and I wrote a short decision note with a trigger to revisit if volume doubled.
Pitfalls
- Two rounds of reply and counter-reply in a pull request (PR) thread without convergence, and certainly ten messages, is a signal to get on a call.
- A call without a written summary leaves the feedback unowned.
Think of a time you gave constructive feedback to a cross-functional partner (a designer, engineer, marketer or salesperson) about their work or how they communicate, when you had no authority over them. How did you frame it and what was the outcome?
Sample Answer
Direct answer
I'll tell an illustrative story skeleton. A salesperson was telling customers a feature would ship by a date engineering had never agreed to, and my job as product manager gave me no authority over sales (no line authority: I could not assign his work, set his goals or affect his performance review). I framed it around a goal we shared (keeping customers' trust), gave the feedback privately and soon after the call, and agreed small follow-ups instead of a lecture.
Situation
In two customer calls the account executive (the salesperson who owns the customer relationship and closes the deal) said "that will be ready next month." The roadmap (the team's plan of what ships when) said the end of next quarter, which is months later than "next month". Engineering was being blamed for a promise it never made. I had no line authority over him, so the only tool was influence: getting someone to change by offering a shared goal, a concrete example, a way to make it easy and an offer of help, because I could not instruct him.
Framing and timing
- Shared goal first: "We both want this customer to renew and trust us."
- Timing: within a day of the call so the example was fresh, but not in the hallway or in front of the customer or his boss.
- Private, then involve others only if needed: I did not copy his manager. I invited him to bring the sales lead if he wanted, which kept him in control. If it had repeated after our agreement, I'd have raised it with both managers, telling him first.
What I said
"On Thursday's call you told them the export feature would land next month. The current plan is the end of next quarter. I think the customer will remember the date. If it slips, they blame both of us. I'm not saying you were careless; the roadmap changes and it's hard to track. What would make it easier to give dates you can stand behind?"
He asked for a one-page "safe to promise" list. That was the follow-up: I'd update it every Monday, and he'd check it before calls.
Following up on how he presents roadmap dates to customers
Later, on his customer deck, I offered a quick pre-read: "Want me to look at the roadmap slide before Wednesday?" Coaching by offer, not correction, kept the relationship warm. When I did read the slide, I said: "The date on this slide is the engineering target, not a commitment. If you label it 'target, confirmed on the 1st of each month', customers will not hear it as a promise, and you keep your credibility if it moves."
Outcome
Date promises matched the plan on the next calls, and he started asking me before quoting dates.
Pitfalls
Escalating first, giving feedback in public, and giving the feedback without an agreed way to help.
Your team lead insists everyone use the feedback sandwich in review comments. Do you agree? Show me how you would give a performance suggestion on a colleague's pull request, and tell me when the sandwich helps and when it backfires.
Sample Answer
Direct answer
I would not agree to a blanket rule. I would tell the lead, with an example, that the sandwich (praise, criticism, praise) works when the praise is specific and true and the criticism is small, and backfires when the praise is a ritual cushion that people learn to ignore or when the real issue gets buried. My rule is simpler: be specific, explain why, and make severity unmistakable; add praise where it is genuinely earned.
A performance suggestion on a colleague's pull request
The pagination logic is easy to follow, and the test for the empty page is a good catch.
Suggestion (non-blocking):
load_all_users()is called inside the request handler and loads every user into memory (the program's working storage) before slicing out one page. That is fine at today's size but gets slower and heavier as the table grows. Could we ask the database for just one page? Two common ways areORDER BY id LIMIT 20 OFFSET 40(skip 40 rows, return the next 20, i.e. rows 41 to 60) or a keyset query (WHERE id > 40 ORDER BY id LIMIT 20: continue after the last id already seen; here 40, assuming ids 1 to 40 were on earlier pages, so it returns the same rows 41 to 60 as the OFFSET form). Both need the ORDER BY: without it the database may return any rows in any order. I can share a short example if useful.
"Non-blocking" is the severity label: the author may merge without fixing it, while "blocking" means it must be fixed before merge. The praise is specific and about this change; the suggestion has a reason and a severity; the closing offer is optional.
When the sandwich helps
- The person is new or visibly discouraged, and there is real good work to point at.
- The criticism is minor and the praise is related to it.
- It is a long relationship where warmth is already established.
When it backfires
- The praise is generic ("nice work!") and followed by "but": people learn to wait for the "but" and discount the first slice.
- The real message is buried, so the person misses that something is blocking.
- It is formulaic: if every comment follows the pattern, readers notice and distrust all of it.
- Urgent or serious issues (a security flaw): clarity matters more than cushioning.
Positive and negative balance
I don't aim for a fixed ratio. I aim to notice good work when it happens, say it when I mean it, and keep criticism separate and clear. A teammate who hears praise only as a cushion starts to hear all praise that way.
How I would raise this with the lead
Not as an objection to their intent (they want kind feedback). I would say, "I want review comments to be kind and clear. Can we agree on: specific praise when it's real, labeled severity, and the reason for every suggestion?" Then show the example above.
Trade-offs and pitfalls
- Dropping praise entirely makes reviews cold and one-directional.
- Over-polishing comments slows reviews; short and clear beats elaborate.
- Accept the lead's decision if the team wants the sandwich; make your own comments good within it.